ACEI

Nicholas O’Dwyer Limited < back to blog

Nicholas O’Dwyer Limited

Project: Vartry Water Supply Scheme

Description: The project comprises a 4km piped replacement of the Callowhill Tunnel, an 80 megalitre/day treatment plant and an 80 megalitre storage reservoir supplying 200,000 consumers. It had numerous stakeholders and interest groups coupled with critical interfaces including SAC's and Grade A dams. Planning permission was a significant risk which led to its division into three independent projects. The consultant prepared a detailed Stakeholder Engagement Plan and assigned a senior resource to manage same. A highly complex and critical project which would not have enjoyed the ultimate success that it did without expert engineering project management. 


Read more at their website https://www.nodwyer.com/, if you'd like to be featured in a future edition of ConsultA or as a spotlight member, get in touch with Louise at Find out more about our members in our members directory - Here: https://www.acei.ie/ws-content/ACEI_2023-p1-176_complete_NEW_V2.pdf