Project: Vartry Water Supply Scheme
Description: The project comprises a 4km piped replacement of the Callowhill Tunnel, an 80 megalitre/day treatment plant and an 80 megalitre storage reservoir supplying 200,000 consumers. It had numerous stakeholders and interest groups coupled with critical interfaces including SAC’s and Grade A dams. Planning permission was a significant risk which led to its division into three independent projects. The consultant prepared a detailed Stakeholder Engagement Plan and assigned a senior resource to manage same. A highly complex and critical project which would not have enjoyed the ultimate success that it did without expert engineering project management.
Read more at their website. If you’d like to be featured in a future edition of ConsultA or as a spotlight member, get in touch with Kelly at kelly.oconnor@acei.ie.
Project: 70 St. Stephen’s Green
Description: A 7,000 m2 office development of five storeys over double basement. The building achieved nZEB, BER A3, LEED Platinum and WELL accreditations. The project was an early forerunner for nZEB compliance before this was either mandatory or usual. The scheme uses many significant innovative design approaches including night time ice generation and the reuse of waste heat to provide a highly efficient building. The consultant used extensive dynamic system simulation to achieve a 26% energy saving through various innovative measures. The project was Highly Commended in the RIAI 2021 Sustainability Awards.
Read more at their website, if you’d like to be featured in a future edition of ConsultA or as a spotlight member, get in touch with Kelly at kelly.oconnor@acei.ie Find out more about our members in our members directory – Here.